Skip to content

Service scope

Move from a requirement to a practical plan

Laboratory projects involve decisions that are connected. Choosing an instrument can affect sample preparation, utilities, space, consumables and user support.

Green Lab Solution helps structure the conversation around these connections. The available service scope is confirmed for each inquiry, taking account of the equipment, site conditions and technical resources required.

01

Define what success requires

Start by describing the work your laboratory needs to carry out. A clear brief creates a basis for comparing options and identifying unanswered questions.

The discussion may cover:

  • Samples and testing objectives
  • Methods and required performance
  • Daily workload and capacity
  • Site conditions and utilities
  • Essential accessories and recurring supplies
02

Review the proposed equipment

A model comparison is useful only when the configurations can be compared fairly. Review included accessories, capacities, technical limits, documentation and operating requirements alongside the main instrument.

Where a preferred model is specified, explain whether alternatives can be considered and which requirements are essential.

  • Included accessories and scope
  • Technical limits and operating requirements
  • Documentation and data handling
  • Whether alternatives can be considered
03

Plan a new or changing workspace

For an expansion or a new laboratory, look at the work in sequence. Identify the preparation stages, measurements and supporting bench activities before finalizing the equipment list.

Planning discussions may consider:

  • Workflow stages and equipment priorities
  • Existing items that will remain in use
  • Required bench space and utility connections
  • Compatibility between equipment and accessories
  • Phased purchasing and setup requirements

Facility design, building works and professional approvals require an independently agreed scope.

04

Clarify the supply arrangement

Before an order is agreed, confirm the proposed configuration, required documents, delivery destination and responsibilities. Procurement deadlines, import requirements and commercial terms should be made explicit.

Where supply coordination is included, the scope and communication arrangements are set out in the relevant proposal.

  • Proposed configuration and documents
  • Delivery destination and responsibilities
  • Procurement deadlines and import requirements
  • Commercial terms set out in writing
05

Get ready for arrival

Installation planning should begin before delivery. Review manufacturer instructions, site readiness and any requirement for a specialist or authorized representative.

Setup, commissioning and initial checks depend on the equipment and agreed service arrangements. The proposal identifies the responsible parties and included activities.

  • Site readiness and utility checks
  • Manufacturer requirements
  • Setup, commissioning and initial checks
  • Named responsible parties
06

Prepare users for routine operation

Where available and agreed, introductory familiarization can cover basic operation, routine care and relevant product documentation.

The content depends on the equipment and available expertise. Method validation and specialist training remain separate requirements unless expressly included.

  • Basic operation walkthrough
  • Routine care and maintenance
  • Product documentation handover
  • Separately agreed method validation or specialist training
07

Identify the right support route

For an equipment issue, begin with the manufacturer, model, serial number and a clear description of the symptoms. Include error messages and relevant operating conditions where possible.

Parts identification, repair coordination, site work and warranty inquiries depend on the product and applicable support arrangements. Availability and timing require confirmation.

  • Manufacturer, model and serial number
  • Clear description of the symptoms
  • Error messages and operating conditions
  • Parts, repair and warranty route